Cochin Port
Cochin Port Authority at Kochi, Keralam. The eleventh busiest of the 12 Major Ports in the 12 months to October 2026, with 34% of its cargo moving along the coast.
- Cargo, 12 months to Oct 2026
- 38.2 MT+0.4% the 12 months before
- April to October 2026
- 21.9 MT+0.7% a year earlier
- Turn round time, 2024-25
- 32 hours
- Containers (TEU), 2024-25
- 0.83 million
Cargo each month
Cochin: overseas and coastal cargo
- Overseas
- Coastal
2.3
What the port handles
- Oil and gas
- Coal
- Iron and other ore
- Containers
- Fertiliser
- Other
- 2022-2335.3 MT
- 2023-2436.3 MT
- 2024-2537.7 MT
| Commodity | 2022-23 | 2023-24 | 2024-25 | Loaded |
|---|---|---|---|---|
| POL Crude | 16,302 | 17,195 | 17,256 | 0% |
| Container | 9,986 | 10,179 | 11,267 | 39% |
| POL Products | 4,965 | 5,723 | 5,938 | 77% |
| Others | 2,272 | 1,656 | 1,784 | 4% |
| Cement | 1,049 | 755 | 836 | 0% |
| FRM - Liquid | 370 | 421 | 243 | 0% |
| FRM - Dry | 171 | 190 | 223 | 0% |
| Salt | 90 | 140 | 131 | 0% |
| Iron & Steel | 31 | 39 | 44 | 0% |
| Veg. Oil | 19 | 17 | 25 | 0% |
Ships and berths
| Year | Turn round, hours | Wait for berth, hours | Tonnes per ship per berth day | Containers, million TEU |
|---|---|---|---|---|
| 2020-21 | 35.8 | 15.4 | 30,915 | – |
| 2021-22 | 45.9 | 11.2 | 31,513 | – |
| 2022-23 | 39.5 | 6.0 | 33,311 | – |
| 2023-24 | 33.4 | 6.7 | 34,594 | 0.75 |
| 2024-25 | 32.4 | 8.8 | 34,509 | 0.83 |
| 2024-25, Annual Report | 32.4 | – | 26,006 | – |
| 2025-26, Annual Report, to December 2025 | 32.6 | – | 25,498 | – |
The last point covers April to September only. Grey is the average across Major Ports.
- Cochin Port
- All Major Ports
13 h
Terminals run by companies
- India Gateway Terminal Private LimitedIndira Gandhi Container Terminal and the International Container Transhipment Terminal. Signed 31 Jan 2005.
- Petronet LNG LimitedLNG port and terminal at Puthuvypeen SEZ. Signed 12 Mar 2009.
- Cochin Shipyard LimitedInternational ship repair facility at Willingdon Island. Signed 24 Dec 2012.
- Indian Oil Corporation LimitedConstruction, operation and maintenance of a multi-user liquid terminal at Puthuvypeen SEZ. Signed 4 Apr 2014.
Developed under PPP since 2016
None, according to the reply.
Revenue and capacity
- Revenue, 2021-22₹759 crore
- Revenue, 2022-23₹827 crore
- Revenue, 2023-24₹964 crore
- Revenue, 2024-25₹999 crore
- Revenue, 2025-26, provisional₹1,091 crore
- Rated capacity, 2024-2581 MT, 47% used
- Main cargo: POL, containers, LNG, fertiliser, transhipment
- Dredged, 2024-25, a figure no official table carries8.1 million m³
Sources10
- MoPSW: Cargo handled at Major Ports, 2026-10shipmin.gov.inPDF document
- MoPSW: Cargo handled at Non-Major Ports, 2026-10shipmin.gov.inPDF document
- MoPSW Transport Research Wing: monthly cargo bulletins for Major and Non-Major Portsshipmin.gov.inPublisher page
- MoPSW: Basic Port Statistics of India 2024-25, Tables 9 to 14, 2.1.3 and 2.2.1shipmin.gov.inPDF document
- MoPSW Transport Research Wing: average pre-berthing detention at Major Ports, time seriesshipmin.gov.inDownloadable data
- Department of Economic Affairs, PPP in India: signed concession agreements (ports)pppinindia.gov.inPublisher page