Agra Metro
Agra. Run by Uttar Pradesh Metro Rail Corp. (UPMRC).
- Running
- 6 km
- Being built
- 23.4 km
- First opened
- 2024
Next: Full Phase 1 corridor opens, 2027. Targets often slip.
6 km operational per Parliament. The rest of the 29.4 km project is under construction, at 72% physical progress across the project in June 2026. Mankameshwar to ISBT has cleared safety inspection, with no opening confirmed.
Route km in the ministry's tables
Operational length the Housing and Urban Affairs ministry printed for Agra in Lok Sabha answers. Its table of February 2026 also gives 24.1 km under construction.
- –21 Dec 2023
- 627 Mar 2025
- 618 Dec 2025
- 65 Feb 2026
Being built
Physical progress at 30 Jun 2026 and sanctioned cost, from a Lok Sabha answer.
- Agra Metro Rail Project72%
29.4 km, ₹8,380 cr
Revenue
Revenue in ₹ crore each financial year, as the ministry gave it to the Lok Sabha. The operator reports its cities together.
Lucknow, Kanpur, Agra together
- 692020-21
- 1272021-22
- 1972022-23
- 3112023-24
- 3832024-25
Operator accounts
From each operator's standalone audited accounts, in ₹ crore. Income can include outside project work and grants.
Uttar Pradesh Metro Rail Corporation Limited
50:50 joint venture of the Union and Uttar Pradesh governments. Income includes ₹160 crore of non-cash grant income and ₹111 crore of deposit interest. Interest includes foreign exchange on the European Investment Bank loan: ₹157 crore in 2024-25 and ₹594 crore in 2023-24. 2023-24 is as restated in the 2024-25 accounts, and debt carries Lucknow's interest-free loans at fair value.
| Year | Income | Fares | Before interest and depreciation | Net result | Debt |
|---|---|---|---|---|---|
| 2024-25 | 383 | 80 | 114 | −625 | 13,330 |
| 2023-24 | 311 | 77 | 108 | −997 | 12,683 |
| 2022-23 | 197 | 66 | 39 | −325 | 10,406 |
| 2021-22 | 127 | 36 | −29 | −314 | 8,729 |
Central money released
Equity, pass-through loans and grants from the Housing and Urban Affairs ministry, in ₹ crore, from a Lok Sabha answer of April 2026.
- 2162020-21
- 1,1222021-22
- 8692022-23
- 1,0452023-24
- 3872024-25
- 4822025-26*, to 2026-03-30
* to 2026-03-30
Sources10
- Lok Sabha unstarred question 1054, Status of Metro Projects, answered 2026-02-05sansad.inPDF document
- Lok Sabha Q 3148, Dec 2025: Uttar Pradesh metro lengthssansad.inPDF document
- Lok Sabha unstarred question 845, Status of Metro Rail Projects, answered 2026-07-23sansad.inPDF document
- UPMRC: Agra Metroupmetrorail.comPublisher page
- Lok Sabha starred question 270, Length of Metro Rail Network, answered 2023-12-21sansad.inPDF document
- Lok Sabha unstarred question 4460, Metro Rail Network, answered 2025-03-27sansad.inPDF document