Skip to content
Know More India

Agra Metro

Agra. Run by Uttar Pradesh Metro Rail Corp. (UPMRC).

Running
6 km
Being built
23.4 km
First opened
2024
Running 6 kmBeing built 23.4 km

Next: Full Phase 1 corridor opens, 2027. Targets often slip.

6 km operational per Parliament. The rest of the 29.4 km project is under construction, at 72% physical progress across the project in June 2026. Mankameshwar to ISBT has cleared safety inspection, with no opening confirmed.

Route km in the ministry's tables

Operational length the Housing and Urban Affairs ministry printed for Agra in Lok Sabha answers. Its table of February 2026 also gives 24.1 km under construction.

  1. –21 Dec 2023
  2. 627 Mar 2025
  3. 618 Dec 2025
  4. 65 Feb 2026

Being built

Physical progress at 30 Jun 2026 and sanctioned cost, from a Lok Sabha answer.

  1. Agra Metro Rail Project72%

    29.4 km, ₹8,380 cr

Revenue

Revenue in ₹ crore each financial year, as the ministry gave it to the Lok Sabha. The operator reports its cities together.

Lucknow, Kanpur, Agra together

  1. 692020-21
  2. 1272021-22
  3. 1972022-23
  4. 3112023-24
  5. 3832024-25

Operator accounts

From each operator's standalone audited accounts, in ₹ crore. Income can include outside project work and grants.

Uttar Pradesh Metro Rail Corporation Limited

50:50 joint venture of the Union and Uttar Pradesh governments. Income includes ₹160 crore of non-cash grant income and ₹111 crore of deposit interest. Interest includes foreign exchange on the European Investment Bank loan: ₹157 crore in 2024-25 and ₹594 crore in 2023-24. 2023-24 is as restated in the 2024-25 accounts, and debt carries Lucknow's interest-free loans at fair value.

YearIncomeFaresBefore interest and depreciationNet resultDebt
2024-2538380114−62513,330
2023-2431177108−99712,683
2022-231976639−32510,406
2021-2212736−29−3148,729

Central money released

Equity, pass-through loans and grants from the Housing and Urban Affairs ministry, in ₹ crore, from a Lok Sabha answer of April 2026.

  1. 2162020-21
  2. 1,1222021-22
  3. 8692022-23
  4. 1,0452023-24
  5. 3872024-25
  6. 4822025-26*, to 2026-03-30

* to 2026-03-30