Skip to content
Know More India
Metro rail in India

Metro systems by city

21 systems carry passengers on 1,131 km of line, and 816 km is being built. 11 more are under construction, approved or proposed.

Route km by city

Metro route km by city and status
375.5104.2–10.224 Dec 2002Dec 2026Golden Line (Aerocity to Tughlakabad) partial opening
96.1121.1–3720 Oct 2011–
91.512121115.88 Jun 2014Dec 2026Line 4 and 4A, Gaimukh to Cadbury Junction, partial opening
73.452.2–15.724 Oct 1984Dec 2026Orange Line full New Garia-Airport corridor; Yellow Line Noapara-New Barrackpore extension
69.2103.9–15.329 Jun 2015–
69––162.529 Nov 2017–
68.3–9.4–6 Mar 2019–
56.454.3––6 Mar 2022–
4043.8––8 Mar 2019–
29.7–14.214.925 Jan 2019–
28.511.2––19 Jun 20172027Phase 2 Pink Line opens
23.6––1522 Feb 2026–
22.9–11.2–6 Sept 2017–
1714.2–57.231 May 20252030Radisson Square to Airport section of the Yellow Line
15.117.3––28 Dec 20212027Corridor 1 completion + Corridor 2 start
12.1––20014 Nov 2013–
12.11.441–3 Jun 2015–
11.1––95.317 Nov 2023–
6.924–77.120 Dec 20252027Phase 1 full corridor opens
6.226.3––7 Oct 2025Jun 2027Mithapur to Khemnichak elevated section (3.1 km)
623.4––20242027Full Phase 1 corridor opens
–40.4–––Nov 2026Dream City to Althan stretch, reported target
–––92––
–––26––
–––27.4––
–––13.1––
–––32––
–––21.8––
–29–––2029Project completion target
–28.5––––
–––46.2––
–––38.4––
32 rows1,130.7815.996.71,113
Sources69
  1. Lok Sabha Q 845: 28.50 km, 3.3% physical progress, June 2026sansad.inPDF document
  2. PMO: Delhi Metro at 375 km, Phase V(A) foundation stones, March 2026pmindia.gov.inPublisher page
  3. DMRC: Network Mapdelhimetrorail.comPublisher page
  4. PIB: construction starts on the 9.913 km Central Vista corridorpib.gov.inPublisher page
  5. Lok Sabha Q 192, Jan 2026: Mumbai region lines and progresssansad.inPDF document
  6. Indian Infrastructure: Union approves Line 5 and 5A, 34.2 km (secondary)indianinfrastructure.comPublisher page
MMRDA: Mumbai Metro projectsSwarajya: Line 2B Diamond Garden to Chembur Naka opens 13 August 2026Lok Sabha Q 1054, Feb 2026: city-wise metro networkBMRCL: 96.10 km operational networkPIB: Kolkata Metro at 73.42 kmLok Sabha Q 3042, Railways, Mar 2026: Kolkata corridorsMetro Railway KolkataLok Sabha Q 6416, Apr 2026: Hyderabad Phase II proposalsHMRL: About, 69 km totalTelangana Today: Hyderabad Phase 2 proposals still pending with the Centre, August 2026Lok Sabha Q 3073, Aug 2026: Chennai Phase IICMRL: Project StatusCMRL: Corridor 4 passenger service, approx. 15 km, from 11 October 2026GMRC: Ahmedabad MetroPIB: 68.28 km operational and GIFT City-Shahpur extensionPIB: Ahmedabad Metro Phase 2A airport corridor approvalKMRL: Phase II statusRajya Sabha Q 2438, Aug 2026: Maharashtra projects at June 2026Rajya Sabha Q 1812, Mar 2026: Pune lengthsMaha-Metro: PunePMO: Pink Line and Phase-II corridor lengthsPMO: Pune Metro Line 3 inaugurated on 3 November 2026PIB: Line 3 as a 23.3 km, 23-station elevated lineMaha-Metro: NagpurLok Sabha Q 3110, Dec 2025: metro networkLok Sabha Q 1943, Jul 2026: sanction datesUPMRC: LucknowPIB: Cabinet approves 11.165 km Lucknow Metro Phase-1BRajya Sabha Q 3409, Mar 2026: Noida extension sanctionRajya Sabha Q 859, Dec 2025: proposal received December 2024, no approvalNMRCPIB: Cabinet approves 11.56 km Sector 142 to Botanical Garden corridorLok Sabha Q 3148, Dec 2025: Uttar Pradesh metro lengthsUPMRC: KanpurPIB: Kanpur Metro initial 9 km inaugurationPIB: 6.4 km Kanpur Metro extension inaugurated in 2025Wikipedia: Rapid Metro GurgaonTheMetroRailGuy: Rapid Metro GurgaonPIB: Jaipur Metro Phase 2 approval and Phase 1 lengthMPMRCL: BhopalPIB: Bhopal Metro inauguration and project lengthRajya Sabha: metro sections inaugurated in 2025PIB: Indore Metro about 17 kmMPMRCL: IndorePTI: Indore service expands from 6 km to 17 km on 6 September 2026IRJ: 11 km Yellow Line extension opens; airport section due by end-2030PIB: Indore Metro passenger-service inaugurationUPMRC: Agra MetroDMRC: Patna MetroHindustan Times: Patna Metro expands to Malahi Pakri, 2 July 2026DeshGujarat: Dream City to Althan likely by end-November (secondary)GMRC: SuratGMRC: project overview, 40.35 km across two corridorsPIB: Meerut Metro inaugurated on 22 February 2026Lok Sabha Q 1992, Dec 2025: southern StatesCMRL: December 2024 newsletter — Coimbatore DPR under Union reviewRajya Sabha Q 2435, Aug 2026: no Bhubaneswar DPR with the ministryOmmcom News: Odisha cabinet terminates DMRC agreement, April 2026 (secondary)Lok Sabha Q 183, Jan 2026: Nashik proposal returnedPIB: Cabinet approves Thane Integral Ring MetroPIB: Cabinet approves HUDA City Centre to Cyber City metroRajya Sabha Q 83, Dec 2025: revised proposal of 46.23 kmRajya Sabha Starred Q 4, Jul 2026: no metro running or being built in Andhra Pradesh