Lucknow Metro
Lucknow. Run by Uttar Pradesh Metro Rail Corp. (UPMRC).
- Running
- 22.9 km
- Being built
- 0 km
- First opened
- 6 Sept 2017
- Riders a day, 2024-25
- 0.8 lakh
Phase 1A (North-South corridor) operational. The Union Cabinet approved the 11.165 km, 12-station Phase-1B in August 2025; it counts as under construction only once work officially starts. Phase 2 corridors remain proposed.
Route km in the ministry's tables
Operational length the Housing and Urban Affairs ministry printed for Lucknow in Lok Sabha answers. Its table of February 2026 also gives 11.2 km under construction.
- 2321 Dec 2023
- 22.927 Mar 2025
- 22.918 Dec 2025
- 22.95 Feb 2026
Riders a day
Average riders a day in each financial year, in lakh, from a Lok Sabha answer of February 2026.
- 0.512021-22
- 0.712022-23
- 0.882023-24
- 0.82024-25
- 0.812025-26*, Till Dec, 2025
* Till Dec, 2025
Being built
Physical progress at 30 Jun 2026 and sanctioned cost, from a Lok Sabha answer.
- Phase 1BNot started
11.2 km, ₹5,801 cr. Preliminary works under progress
Approved projects
Projects the Union government sanctioned, with the length, cost and the daily riders their detailed project report forecast, where the ministry published one.
Phase 1B
11.2 km, ₹5,801 cr, ₹520 cr a km. Forecast 2,74,074 riders a day by 2027
Sections opened
Sections the ministry lists as opened in the financial years 2018-19 to 2023-24, and in the calendar year 2025.
- 2018-19
CCS Airport to Transport Nagar, 14.4 km
Revenue
Revenue in ₹ crore each financial year, as the ministry gave it to the Lok Sabha. The operator reports its cities together.
Lucknow, Kanpur, Agra together
- 692020-21
- 1272021-22
- 1972022-23
- 3112023-24
- 3832024-25
Operator accounts
From each operator's standalone audited accounts, in ₹ crore. Income can include outside project work and grants.
Uttar Pradesh Metro Rail Corporation Limited
50:50 joint venture of the Union and Uttar Pradesh governments. Income includes ₹160 crore of non-cash grant income and ₹111 crore of deposit interest. Interest includes foreign exchange on the European Investment Bank loan: ₹157 crore in 2024-25 and ₹594 crore in 2023-24. 2023-24 is as restated in the 2024-25 accounts, and debt carries Lucknow's interest-free loans at fair value.
| Year | Income | Fares | Before interest and depreciation | Net result | Debt |
|---|---|---|---|---|---|
| 2024-25 | 383 | 80 | 114 | −625 | 13,330 |
| 2023-24 | 311 | 77 | 108 | −997 | 12,683 |
| 2022-23 | 197 | 66 | 39 | −325 | 10,406 |
| 2021-22 | 127 | 36 | −29 | −314 | 8,729 |
Sources14
- Lok Sabha unstarred question 3110, Metro Rail Network and its Achievements, answered 2025-12-18sansad.inPDF document
- Lok Sabha unstarred question 1943, Status of Metro Rail Projects, answered 2026-07-30sansad.inPDF document
- UPMRC: Lucknowupmetrorail.comPublisher page
- PIB: Cabinet approves 11.165 km Lucknow Metro Phase-1Bpib.gov.inPublisher page
- Lok Sabha starred question 270, Length of Metro Rail Network, answered 2023-12-21sansad.inPDF document
- Lok Sabha unstarred question 4460, Metro Rail Network, answered 2025-03-27sansad.inPDF document