Thane Integral Ring Metro

Thane. Run by Maha-Metro.

Running
0 km
Being built
29 km
First opened
Not yet open
Being built 29 km

Next: Project completion target, 2029. Targets often slip.

29 km ring, 26 km elevated and 3 km underground, with 22 stations. Sanctioned in September 2024. The ministry lists it separately from Mumbai. Operator name is from press reports of Maha-Metro's tenders.

Route km in the ministry's tables

None of the ministry's city tables in Lok Sabha answers shows Thane with track running. Its table of February 2026 gives 29 km under construction.

Being built

Physical progress at 30 Jun 2026 and sanctioned cost, from a Lok Sabha answer.

  1. Thane Metro Rail Project9.5%

    29 km, ₹12,200 cr

Approved projects

Projects the Union government sanctioned, with the length, cost and the daily riders their detailed project report forecast, where the ministry published one.

  • Thane Integral Metro Rail Project

    29 km, ₹12,200 cr, ₹421 cr a km. Forecast 6,47,000 riders a day by 2029

Central money released

Equity, pass-through loans and grants from the Housing and Urban Affairs ministry, in ₹ crore, from a Lok Sabha answer of April 2026.

  1. 02020-21
  2. 02021-22
  3. 02022-23
  4. 02023-24
  5. 02024-25
  6. 1002025-26*, to 2026-03-30

* to 2026-03-30