Indore Metro
Indore. Run by Madhya Pradesh Metro Rail Corp. (MPMRCL).
- Running
- 17 km
- Being built
- 14.2 km
- First opened
- 31 May 2025
Next: Radisson Square to Airport section of the Yellow Line, 2030. Targets often slip.
The 6.2 km Yellow Line super-priority corridor entered passenger service on 31 May 2025. The 11 km section to Malviya Nagar Chauraha opened to passengers on 6 September 2026, giving about 17 km and 16 stations per PIB. The remaining 14.15 km of the 31.15 km project in the ministry's June 2026 table is under construction.
Route km in the ministry's tables
Operational length the Housing and Urban Affairs ministry printed for Indore in Lok Sabha answers. Its table of February 2026 also gives 25.4 km under construction.
- –21 Dec 2023
- –27 Mar 2025
- 6.218 Dec 2025
- 6.25 Feb 2026
Being built
Physical progress at 30 Jun 2026 and sanctioned cost, from a Lok Sabha answer.
- Indore Metro Rail Project64.2%
31.1 km, ₹7,501 cr
Sections opened
Sections the ministry lists as opened in the financial years 2018-19 to 2023-24, and in the calendar year 2025.
- 2025
MP Metro Indore, 6.2 km
Operator accounts
From each operator's standalone audited accounts, in ₹ crore. Income can include outside project work and grants.
Madhya Pradesh Metro Rail Corporation Limited
50:50 joint venture of the Union and Madhya Pradesh governments. No fare service in these years: Indore opened on 31 May 2025. Income is mostly deposit interest and most project costs go to capital work in progress, so the small loss says nothing yet about running a metro.
| Year | Income | Fares | Before interest and depreciation | Net result | Debt |
|---|---|---|---|---|---|
| 2024-25 | 68 | – | 5 | −1 | 4,055 |
| 2023-24 | 37 | – | 2 | −2 | 2,992 |
Central money released
Equity, pass-through loans and grants from the Housing and Urban Affairs ministry, in ₹ crore, from a Lok Sabha answer of April 2026.
- 02020-21
- 2512021-22
- 2602022-23
- 1,1062023-24
- 2902024-25
- 1,0602025-26*, to 2026-03-30
* to 2026-03-30
Sources16
- PIB: Indore Metro about 17 kmpib.gov.inPublisher page
- Lok Sabha unstarred question 845, Status of Metro Rail Projects, answered 2026-07-23sansad.inPDF document
- MPMRCL: Indorempmetrorail.comPublisher page
- PTI: Indore service expands from 6 km to 17 km on 6 September 2026telanganatoday.comPublisher page
- IRJ: 11 km Yellow Line extension opens; airport section due by end-2030railjournal.comPublisher page
- PIB: Indore Metro passenger-service inaugurationpib.gov.inPublisher page