Ahmedabad Metro
Ahmedabad / Gandhinagar. Run by Gujarat Metro Rail Corp. (GMRC).
- Running
- 68.3 km
- Being built
- 0 km
- First opened
- 6 Mar 2019
- Riders a day, 2024-25
- 1.25 lakh
Phase 1 and the main Phase 2 Gandhinagar/GIFT City corridors are operational. Two further extensions are approved but not counted as under construction: GIFT City-Shahpur (3.33 km) and Koteshwar Road-Airport (6.032 km).
Route km in the ministry's tables
Operational length the Housing and Urban Affairs ministry printed for Ahmedabad in Lok Sabha answers.
- 3921 Dec 2023
- 60.827 Mar 2025
- 62.718 Dec 2025
- 68.35 Feb 2026
Riders a day
Average riders a day in each financial year, in lakh, from a Lok Sabha answer of February 2026.
Phase I is fully operational from December, 2024
- 0.872023-24
- 1.252024-25
- 1.542025-26*, Till Dec, 2025
* Till Dec, 2025
Being built
Physical progress at 30 Jun 2026 and sanctioned cost, from a Lok Sabha answer.
- Phase 2BNot started
3.3 km, ₹1,067 cr. Preliminary works under progress
- Phase 2ANot started
6 km, ₹2,169 cr. Preliminary works under progress
Approved projects
Projects the Union government sanctioned, with the length, cost and the daily riders their detailed project report forecast, where the ministry published one.
Phase 2B
3.3 km, ₹1,067 cr, ₹321 cr a km
Phase 2A
6 km, ₹2,169 cr, ₹360 cr a km
Sections opened
Sections the ministry lists as opened in the financial years 2018-19 to 2023-24, and in the calendar year 2025.
- 2018-19
Vastral Gam to Apparel Park, 6.5 km
- 2022-23
Apparel Park to Thaltej, 13.2 km
APMC to Motera Stadium, 18.9 km
- 2025
Ahmedabad Metro Phase II, 1.9 km
Revenue
Revenue in ₹ crore each financial year, as the ministry gave it to the Lok Sabha.
- 532020-21
- 972021-22
- 1492022-23
- 3002023-24
- 3862024-25
Operator accounts
From each operator's standalone audited accounts, in ₹ crore. Income can include outside project work and grants.
Gujarat Metro Rail Corporation (GMRC) Limited
50:50 special purpose vehicle. Income fell from ₹873 crore because 2023-24 carried a ₹573 crore foreign exchange gain on loans. In 2024-25 grants of ₹217 crore and deposit interest of ₹118 crore outweigh passenger revenue of ₹48 crore.
| Year | Income | Fares | Before interest and depreciation | Net result | Debt |
|---|---|---|---|---|---|
| 2024-25 | 386 | 48 | 73 | −550 | 8,535 |
| 2023-24 | 873 | 35 | 627 | 240 | 6,428 |
| 2022-23 | 149 | – | – | – | – |
Central money released
Equity, pass-through loans and grants from the Housing and Urban Affairs ministry, in ₹ crore, from a Lok Sabha answer of April 2026.
- 8932020-21
- 1,3242021-22
- 1,9682022-23
- 6282023-24
- 1,0212024-25
- 8232025-26*, to 2026-03-30
* to 2026-03-30
Sources15
- GMRC: Ahmedabad Metrogujaratmetrorail.comPublisher page
- PIB: 68.28 km operational and GIFT City-Shahpur extensionpib.gov.inPublisher page
- PIB: Ahmedabad Metro Phase 2A airport corridor approvalpib.gov.inPublisher page
- Lok Sabha starred question 270, Length of Metro Rail Network, answered 2023-12-21sansad.inPDF document
- Lok Sabha unstarred question 4460, Metro Rail Network, answered 2025-03-27sansad.inPDF document
- Lok Sabha unstarred question 3110, Metro Rail Network and its Achievements, answered 2025-12-18sansad.inPDF document