Kolkata Metro

Kolkata. Run by Metro Railway, Kolkata + KMRC.

Running
73.4 km
Being built
52.2 km
First opened
24 Oct 1984
Running 73.4 kmBeing built 52.2 kmProposed 15.7 km

Next: Orange Line full New Garia-Airport corridor; Yellow Line Noapara-New Barrackpore extension, Dec 2026. Targets often slip.

India's first metro. Five colour-coded lines and 73.42 km per PIB. Under construction is the Railways' itemised 52.19 km across four corridors, of which about 20 km is held up. The Housing ministry's table prints 60.26 km, which is 8.07 km more.

Route km in the ministry's tables

Operational length the Housing and Urban Affairs ministry printed for Kolkata in Lok Sabha answers. Its table of February 2026 also gives 60.3 km under construction.

  1. 4721 Dec 2023
  2. 59.427 Mar 2025
  3. 7318 Dec 2025
  4. 735 Feb 2026

Sections opened

Sections the ministry lists as opened in the financial years 2018-19 to 2023-24, and in the calendar year 2025.

2019-20

Salt Lake Sector V to Salt Lake Stadium, 5.3 km

2020-21

Small portion of corridor including Phoolbagan station, 1.7 km

Noapara to Dakshineswar, 4.1 km

2022-23

Joka to Taratala, 6.5 km

Phool Bagan to Sealdah, 2.3 km

2025

Kolkata Metro East west corridor, 2.5 km

Kolkata Metro MoR, 11.2 km

Operator accounts

From each operator's standalone audited accounts, in ₹ crore. Income can include outside project work and grants.

Metro Railway, Kolkata

Zonal railway, a department of the Union government. Departmental railway figures, not company accounts, so no interest, depreciation or debt of its own is shown. The loss is receipts less revenue expenditure, ₹806 crore in 2023-24. CAG's Finance Accounts figures for that year are ₹811 crore and a ₹470 crore loss, with an operating ratio of 238.

YearIncomeFaresBefore interest and depreciationNet resultDebt
2023-24341286–−465–
2022-23308––−424–
2021-22147––−487–

Central money released

Equity, pass-through loans and grants from the Housing and Urban Affairs ministry, in ₹ crore, from a Lok Sabha answer of April 2026.

KMRCL East-West corridor

  1. 8002020-21
  2. 9352021-22
  3. 3002022-23
  4. 5002023-24
  5. 5002024-25
  6. 02025-26*, to 2026-03-30

* to 2026-03-30