Hyderabad Metro

Hyderabad. Run by L&T Metro Rail (Hyderabad).

Running
69 km
Being built
0 km
First opened
29 Nov 2017
Running 69 kmProposed 162.5 km

Phase 1 fully operational. The ministry lists nothing under construction. Phase-II (76.4 km) and Phase-II(B) (86.1 km) proposals are with the Union ministry and not approved. A State-funded Old City stretch would not appear in these tables; no km for it could be sourced.

Route km in the ministry's tables

Operational length the Housing and Urban Affairs ministry printed for Hyderabad in Lok Sabha answers.

  1. 6921 Dec 2023
  2. 6927 Mar 2025
  3. 6918 Dec 2025
  4. 695 Feb 2026

Sections opened

Sections the ministry lists as opened in the financial years 2018-19 to 2023-24, and in the calendar year 2025.

2018-19

Ameerpet to LB Nagar, 16 km

Ameerpet to Hitech city, 10.5 km

2019-20

Jubilee Bus Station to Mahatama Gandhi Bus Station, 11 km

Hitech City - Raidurg, 1.5 km

Operator accounts

From each operator's standalone audited accounts, in ₹ crore. Income can include outside project work and grants.

L&T Metro Rail (Hyderabad) Limited

Private concessionaire, public limited company, not government-owned for the years shown. A private concessionaire, not a government company. 2023-24 income included a one-time ₹512 crore from selling a real estate undertaking.

YearIncomeFaresBefore interest and depreciationNet resultDebt
2024-251,113–617−62613,126
2023-241,408603927−55513,059
2022-23703458272−1,316–
2021-22475–37−1,746–
2020-21386–−44−1,767–
2019-201,371–306−382–