Chennai Metro
Chennai. Run by Chennai Metro Rail Limited (CMRL).
- Running
- 69.2 km
- Being built
- 103.9 km
- First opened
- 29 Jun 2015
- Riders a day, 2024-25
- 4.58 lakh
54.24 km per the ministry plus Phase 2 Corridor 4, Poonamallee Bypass to Vadapalani, opened 11 October 2026: 11 elevated stations over approx. 15 km, CMRL's rounded length, so the sum is approximate. The rest of the 118.9 km Phase II remains under construction at 54.62% physical progress.
Route km in the ministry's tables
Operational length the Housing and Urban Affairs ministry printed for Chennai in Lok Sabha answers. Its table of February 2026 also gives 118.9 km under construction.
- 5421 Dec 2023
- 54.227 Mar 2025
- 54.218 Dec 2025
- 54.25 Feb 2026
Riders a day
Average riders a day in each financial year, in lakh, from a Lok Sabha answer of February 2026.
- 1.92021-22
- 3.412022-23
- 4.152023-24
- 4.582024-25
- 4.642025-26*, Till Dec. 2025
* Till Dec. 2025
Being built
Physical progress at 30 Jun 2026 and sanctioned cost, from a Lok Sabha answer.
- Phase 254.6%
118.9 km, ₹63,246 cr
Approved projects
Projects the Union government sanctioned, with the length, cost and the daily riders their detailed project report forecast, where the ministry published one.
Phase II
118.9 km, ₹63,246 cr, ₹532 cr a km. Forecast 17,73,000 riders a day by 2025
Sections opened
Sections the ministry lists as opened in the financial years 2018-19 to 2023-24, and in the calendar year 2025.
- 2018-19
Nehru Park to Central Metro, 2.6 km
Little Mount to AG-DMS, 4.8 km
AGDMS to Washermenpet, 10 km
- 2020-21
Washermenpet to WIMCO Nagar, 9.1 km
Revenue
Revenue in ₹ crore each financial year, as the ministry gave it to the Lok Sabha.
- 1502020-21
- 2112021-22
- 4852022-23
- 1,5582023-24
- 6242024-25
Operator accounts
From each operator's standalone audited accounts, in ₹ crore. Income can include outside project work and grants.
Chennai Metro Rail Limited
Joint venture of the Union and Tamil Nadu governments. The swing from a ₹428 crore profit in 2023-24 is largely foreign exchange on loans: a ₹1,082 crore gain, then a ₹429 crore loss.
| Year | Income | Fares | Before interest and depreciation | Net result | Debt |
|---|---|---|---|---|---|
| 2024-25 | 624 | 290 | – | −1,003 | – |
| 2023-24 | 1,558 | 265 | – | 428 | – |
Central money released
Equity, pass-through loans and grants from the Housing and Urban Affairs ministry, in ₹ crore, from a Lok Sabha answer of April 2026.
- 1,6212020-21
- 9362021-22
- 02022-23
- 02023-24
- 5,2202024-25
- 8,6882025-26*, to 2026-03-30
* to 2026-03-30
Sources15
- Lok Sabha unstarred question 1054, Status of Metro Projects, answered 2026-02-05sansad.inPDF document
- Lok Sabha Q 3073, Aug 2026: Chennai Phase IIsansad.inPDF document
- CMRL: Project Statuschennaimetrorail.orgPublisher page
- CMRL: Corridor 4 passenger service, approx. 15 km, from 11 October 2026chennaimetrorail.orgPDF document
- Lok Sabha starred question 270, Length of Metro Rail Network, answered 2023-12-21sansad.inPDF document
- Lok Sabha unstarred question 4460, Metro Rail Network, answered 2025-03-27sansad.inPDF document