Kanpur Metro
Kanpur. Run by Uttar Pradesh Metro Rail Corp. (UPMRC).
- Running
- 15.1 km
- Being built
- 17.3 km
- First opened
- 28 Dec 2021
Next: Corridor 1 completion + Corridor 2 start, 2027. Targets often slip.
The initial 9 km section opened in December 2021 and a further extension on 30 May 2025, giving the ministry's 15.12 km. The remaining 17.26 km of the sanctioned 32.38 km Phase 1 is under construction, at 82% physical progress in June 2026.
Route km in the ministry's tables
Operational length the Housing and Urban Affairs ministry printed for Kanpur in Lok Sabha answers. Its table of February 2026 also gives 17.3 km under construction.
- 921 Dec 2023
- 8.727 Mar 2025
- 15.118 Dec 2025
- 15.15 Feb 2026
Being built
Physical progress at 30 Jun 2026 and sanctioned cost, from a Lok Sabha answer.
- Kanpur Metro Rail Project82%
32.4 km, ₹11,076 cr
Sections opened
Sections the ministry lists as opened in the financial years 2018-19 to 2023-24, and in the calendar year 2025.
- 2021-22
IIT Kanpur to Moti Jheel, 9 km
- 2025
Kanpur Metro, 6.4 km
Revenue
Revenue in ₹ crore each financial year, as the ministry gave it to the Lok Sabha. The operator reports its cities together.
Lucknow, Kanpur, Agra together
- 692020-21
- 1272021-22
- 1972022-23
- 3112023-24
- 3832024-25
Operator accounts
From each operator's standalone audited accounts, in ₹ crore. Income can include outside project work and grants.
Uttar Pradesh Metro Rail Corporation Limited
50:50 joint venture of the Union and Uttar Pradesh governments. Income includes ₹160 crore of non-cash grant income and ₹111 crore of deposit interest. Interest includes foreign exchange on the European Investment Bank loan: ₹157 crore in 2024-25 and ₹594 crore in 2023-24. 2023-24 is as restated in the 2024-25 accounts, and debt carries Lucknow's interest-free loans at fair value.
| Year | Income | Fares | Before interest and depreciation | Net result | Debt |
|---|---|---|---|---|---|
| 2024-25 | 383 | 80 | 114 | −625 | 13,330 |
| 2023-24 | 311 | 77 | 108 | −997 | 12,683 |
| 2022-23 | 197 | 66 | 39 | −325 | 10,406 |
| 2021-22 | 127 | 36 | −29 | −314 | 8,729 |
Central money released
Equity, pass-through loans and grants from the Housing and Urban Affairs ministry, in ₹ crore, from a Lok Sabha answer of April 2026.
- 1,1362020-21
- 2,0122021-22
- 1,1572022-23
- 1,4732023-24
- 2622024-25
- 4282025-26*, to 2026-03-30
* to 2026-03-30
Sources14
- Lok Sabha unstarred question 1054, Status of Metro Projects, answered 2026-02-05sansad.inPDF document
- Lok Sabha Q 3148, Dec 2025: Uttar Pradesh metro lengthssansad.inPDF document
- UPMRC: Kanpurupmetrorail.comPublisher page
- PIB: Kanpur Metro initial 9 km inaugurationpib.gov.inPublisher page
- PIB: 6.4 km Kanpur Metro extension inaugurated in 2025pib.gov.inPublisher page
- Lok Sabha starred question 270, Length of Metro Rail Network, answered 2023-12-21sansad.inPDF document