Kudankulam Nuclear Power Station
Kudankulam, Dist - Tirunellveli-Kattabomman, Tamilnadu
- Units
- 2
- 2,000 MW rated
- In service since
- 2014
- KKNPS Unit-1, 31 Dec 2014
- Generated since then
- 130 TWh
- NPCIL, to Oct 2026
- Generated in 2026-27
- 9,794 MU
- April to Oct 2026
Units, from commercial operation
- Pressurised water (VVER)
- Licence valid to
Every unit
- UnitTypeCapacityIn serviceLifetime outputLicence
- KKNPS-1PWR(VVER-1000)1000 MW31 Dec 201471,775 MUValid to Jul 2030
- KKNPS-2PWR(VVER-1000)1000 MW31 Mar 201758,630 MUValid to Jul 2030
Capacity factor, 2026-27 to date
- KKNPS-298%5,027 MU
- KKNPS-193%4,767 MU
Being built here
- Kudankulam-3 (KKNPP-3)NPCIL (Nuclear Power Corporation of India Ltd)1,000 MWUnder construction, VVERConstruction start 29 June 2017; fuel delivered December 2025; Spillage to Open Reactor, a commissioning milestone, reached on 25 April 2026.
- Kudankulam-4 (KKNPP-4)NPCIL (Nuclear Power Corporation of India Ltd)1,000 MWUnder construction, VVERConstruction start 23 October 2017; commissioning expected after KKNPP-3.
- Kudankulam-5 (KKNPP-5)NPCIL (Nuclear Power Corporation of India Ltd)1,000 MWUnder construction, VVERFirst concrete poured 29 June 2021; reactor pressure vessel erected in June 2026.
- Kudankulam-6 (KKNPP-6)NPCIL (Nuclear Power Corporation of India Ltd)1,000 MWUnder construction, VVERFirst concrete poured December 2021; current operator target September 2027.
Sources6
- NPCIL: All Plantsnpcil.nic.inPublisher page
- NPCIL: Operating Performance, Kudankulam, Dist - Tirunellveli-Kattabomman, Tamilnadunpcil.nic.inPublisher page
- AERB: Validity of the operating licence of various NPPs (March 2026)aerb.gov.inPDF document
- IAEA PRIS: India country pagepris-stats.iaea.orgPublisher page
- NPCIL: KKNPP-3 Spillage to Open Reactor on 25 April 2026npcil.nic.inPDF document
- NPCIL: KKNPP-5 reactor pressure vessel erected in June 2026npcil.nic.inPDF document